Define the work
Record the work area, task, equipment, people and expected conditions. Confirm whether the RAMS covers maintenance, installation, repair, cleaning, shutdown or another non-routine activity.
Create, approve and issue manufacturing RAMS in one connected EHS platform. Evalu-8 EHS helps your teams plan machinery maintenance, installations, shutdowns, hot work and contractor activity while keeping hazards, controls, supporting documents, approvals, versions and acknowledgements connected.
You are in good company. Trusted by H&S teams from companies like
The problem is rarely that the manufacturer has no RAMS documents. The problem is that the documents are stored in different folders, adapted from old jobs, sent through email and separated from the people who need to follow them.
The job is typically planned in Word
A previous RAMS is copied, renamed, and edited for the next maintenance task, installation, or shutdown. Nobody is completely sure which parts were properly reviewed and which parts were carried over from the old job.
The document is approved through email
Create reusable templates and approved question libraries for different production lines, activities, and sites. Apply the same inspection standard while still allowing questions to reflect local equipment and risks.
The work changes on the day
Access arrangements, equipment, personnel, production schedules or surrounding activity may be different from what was originally planned. The approved document can still be available, but no longer fully reflect the work taking place.
Create manufacturing RAMS
Build consistent, job-specific RAMS without starting from scratch or relying on generic templates.
Resolve changes before work begins
Evalu-8 EHS brings reviews, updates and approvals into one system, helping maintenance, production, engineering, health and safety teams, and contractors collaborate without relying on email chains.
Keep the current RAMS clear, controlled and ready before work begins.
Prove the right people received the RAMS
Share approved RAMS with employees and contractors, then keep a clear record of who reviewed each version.
Prove the correct RAMS reached the right people before work began.
RAMS shaped around your manufacturing environment
Manufacturing RAMS should reflect the environment where the work is taking place. Each area brings different equipment, hazards, people, and operational interfaces.
Plan RAMS for conveyors, automated lines, robotics and process machinery, including isolation, restricted access and recommissioning.
Create RAMS for machining, welding, cutting and repairs, covering hot work, fumes, noise, lifting and segregation.
Plan work involving boilers, compressors, electrical systems and pipework, including isolation, stored energy and controlled reinstatement.
Manage work around racking, loading bays and vehicle routes, covering exclusion zones, lifting equipment and work at height.
Control work involving hazardous substances and process equipment, including isolation, PPE, spill response and waste disposal.
Prepare RAMS for installation, servicing and maintenance away from your factory, covering site rules, access and changing conditions.
Give employees, supervisors and contractors quick access to the approved RAMS from the factory floor.
Evalu-8 EHS lets teams open the relevant document from a phone or tablet using QR codes placed on equipment, in work areas or within job packs.
Make sure the team follows the current approved method, rather than the easiest copy to find.
From defining the task to issuing the approved document, every stage stays connected.
Record the work area, task, equipment, people and expected conditions. Confirm whether the RAMS covers maintenance, installation, repair, cleaning, shutdown or another non-routine activity.
01Identify the hazards and controls, then set out the required equipment, PPE, isolations, access arrangements, emergency information and safe sequence of work.
02Complete the required reviews, record any changes and issue the approved RAMS to the employees, supervisors or contractors carrying out the work.
03Update the RAMS when the task or conditions change. Retain the approval, acknowledgement and version history so the business can show what applied at the time.
04Build task-specific documents using reusable method statements and approved control measures.
Use review dates, expiry alerts and a clear view of which documents require attention.
Retain the history of changes, approvals, distribution and acknowledgements.
UK law does not require manufacturers to produce a document called
a RAMS for every task. It does require employers to assess risks,
introduce suitable controls and communicate safe working arrangements
to the people carrying out the work.
For higher-risk, complex or non-routine activities, a method statement
can explain how those controls will be applied in practice. The RAMS
should reflect the actual equipment, environment, substances, people
and working conditions involved.
Manufacturing tasks can involve different equipment, hazards, people and operating conditions. Evalu-8 EHS helps you create task-specific RAMS, control approvals and make the current safe method available before work begins.
Create task-specific RAMS before engineers remove guards, access dangerous parts or begin intrusive maintenance and fault repair.
Plan the delivery, movement, assembly, connection and commissioning of new machinery and production equipment.
Create coordinated RAMS for maintenance periods involving several teams, contractors, isolations and simultaneous activities.
Plan non-routine access to machinery during cleaning, blockage removal and production changeovers.
Define the controls for fabrication, repair and modification work involving ignition, heat, fumes and fire risk.
Review and control the method proposed by external engineers, installers and specialist contractors working on your site.
Yes. Manufacturers can create consistent RAMS templates and control libraries centrally, while adapting each document to the equipment, task, contractor, and conditions at the individual site.
Yes. Approved method statements and control measures can be reused where appropriate, reducing repeated drafting. Each RAMS should still be reviewed to confirm that it reflects the specific job and working conditions.
Yes. Evalu-8 EHS can collect digital acknowledgements, signatures and timestamps, providing a clear record of who received and reviewed the RAMS before work began.
Yes. Evalu-8 records document changes, approvals and previous versions, helping teams identify the current approved RAMS and retrieve earlier records when needed.
A RAMS should be reviewed whenever the task, equipment, substances, people, work area, or surrounding activity changes. It should also be reviewed after an incident, near miss, or evidence that an existing control is not effective.
Fill in your details and we'll send you a personalised guided tour of the platform — no sales pressure, just a clear look at what Evalu-8 can do for your team.
Speak with one of our EHS specialists and see how Evalu-8 can solve your specific health and safety challenges.
Copyright Evalu-8 Software Ltd 2026
Evalu-8 Software Ltd
Earl Business Centre
Oldham
OL8 2PF
0161 5289466